HOME

BACK TO COLLECTIONS

BACK TO ORAL HISTORIES

CONTACT US

Preston Layton Papers
Finding Guide

Boxes 31-35

 


Box 31 Nuclear Space Systems ("Nuclear")

31-1

"Qualitative Analysis of Reactor Protective System," B.M. Tashjian, January 23-35, 1973.

31-2

"Perspectives on the Development of Fusion Power by Magnetic Confinement-1977."

31-3

"Status and Prospects of Nuclear Power an Interim Survey... Status as of July 1958."

31-4 "Nuclear Plant Reliability Data System," May 1974.
31-5

"Environmental Radiation Dose Commitment: An Application to the Nuclear Power Industry," February 1974, Revised June 1974.

31-6

"Statement of Mr. Glen A. New by, Acting Director Division of Nuclear Research and Application Energy Research and Development Administration FY 1977 Authorization Hearings Before the Joint Committee on Atomic Energy," February 4, 1976.

31-7

"Small Nuclear (Isotope) Powered Thrusters for Satellite Maneuvers," Ira Helms.

31-8

"Program Approval Document: Executive Summary Energy Research and Development Administration Nuclear Energy Development," October 29, 1976.

31-9

"A Report on the Different Aspects of the U.S. Space Program," J. Preston Lay ton, April 1, 1975.

31-10

"Supplemental Agreement Number I to Terms of Reference for the DOD/ERDA Space Nuclear Applications Steering Group," February 26, 1976.

31-11

"Advanced Nuclear Reactors- An Introduction," U.S. Energy Research and Development Administration, 1975.

31-12

"Nuclear vs. Solar Power for Earth-Orbit Missions," Bernard Raab and Jay J. Karlin, August 26-30, 1974.

31-13

"Nuclear-Powered GPS Spacecraft Design Study," May 1977.

31-14

"Preliminary Considerations on the Use of Nuclear-Electric Power in Commercial Satellites," Bernard Raab,July 5, 1973.

31-15

"Nuclear Heat Sources for Cryogenic Refrigerator Applications," June 6, 1975.

31-16

"Use of Modular Heat Source Stack in RTGs," A. Schock and A. Shostak, 1979.

31-17

"Direct-Cycle and Process Heat HTGR Development," Peter Fortescue and Robert M. Quade, April 1, 1974.

31-18 "Gas Turbine HTGR Power Plant," January 1974.
31-19

"Fuel Economics of GCFR/HTGR Symbiotic Systems," R. Brogli and G. Schlueter, August 30, 1974.

31-20

"Manufacturing Plan ERTG Ring Converter," Final status Report, May 1, 1974.

31-21

"Curium-244/Neptunium-237 Recovery From the Barnwell Nuclear Fuel Plant," Final Briefing, June 5, 1974.

31-22

"Economic Radioisotope Thermoelectric Generator Study," Final Report, January 1974.

31-23

"HTGR Preliminary Safety Evaluation and Environmental Information Document," February 14, 1979.

31-24

"Nuclear Pulse Space Vehicles Study," Volume IV Supplement-Mission Velocity Requirements and System Comparisons, February 28, 1966.

31-25

"Nuclear Pulse Space Vehicles Study," Volume IV-Mission Velocity Requirements and System Comparisons, February 28, 1966.

31-26

"Questions on the Future of Nuclear Power: Implications and Trade-Offs," Report to the Congress, May 21, 1979.

31-27

"U.S. Nuclear Non-Proliferation Policy: Impact on Exports and Nuclear Industry Could Not Be Determined," Report to the Congress, September 23, 1980.

31-28

"Areas Around Nuclear Facilities Should Be Better Prepared for Radiological Emergencies," Report to the Congress, March 30, 1979.

31-29

"Security at Nuclear Power Plants- At Best, Inadequate," Report to the Congress, April 7, 1977.

31-30 

"Review of the Department of Energy's Plans for Dealing with Contaminated Nuclear Sites," united states General Accounting Office, January 17, 1979.

31-31

"Nuclex '72 Papers Confirm Potential of Nuclear Gas Turbines," Dr. Curt Keller, Nuclear News, January 1973.

31-32

"A Proposal for the Study of Military Mission Sensitivity to Nuclear Rocket Engine Parameters," General Dynamics/Astronautics, May 10, 1963.

31-33

"A Technical Plan for NASA Evaluation with Models of Optimized Nuclear Spacecraft," William S. West, March1966.

31-34

"Spacecraft Charge Build-up Analysis," William S. West, J. V. Gore, M. A. Kasha, and Herbert W. Bilsky, April1969.

31-35

"Spacecraft Analysis and Design," Wm. S. West, H.W. Bilsky, W. Bernard, J. Scussel, and R. Goldberg, April1969.

31-36

"Subsystem Radiation Susceptibility Analysis for Deep-Space Missions," Wm. West, W. Poch, A. Holmes-siedle, H. Bilsky, and D. Carroll, April 1969.

31-37

"Weight Minimization Analysis," William s. West and Herbert W. Bilsky, April 1969.

31-38

"Planar-RTG Component Feasibility Study," William S. West, Andrew J. Parker, Jr., and Herbert W. Bilsky,April1969.

31-39

"Planar-RTG Spacecraft Feasibility Study," William S. West and Herbert W. Bilsky, April 1969.

31-40

"Summary Report of the New Moons Program," William S. West and Herbert W. Bilsky, April 1969.

31-41

"Spacecraft Test Documentation," William s. West, Herbert W. Bilsky, William Bernard, and J. Scussel,April1969.

31-42 "Analysis of Selected Deep-Space Missions," William S. West, J. Michael, L. Holman, and Herbert W. Bilsky,April1969.

 

Box 32 Nuclear Space Flight Systems

32-1

"Nuclear Stage Definition Study, Phase IV, Final Report Volume I-Executive Summary," February 1973.

32-2

"Nuclear Stage System Definition Study, Phase IV Final Report Volume II, Baseline System Definition," February1973.

32-3

"Nuclear Stage Definition Study, Phase IV, Final Report, Volume III, System Analyses and Trade Studies," February 1973.

32-4

"Nuclear Stage Definition Study Phase IV, Final Report, Volume IV, Program Analyses and Trade Studies," February 1973.

32-5

"Nuclear Stage System Definition Study, Phase IV Final Report, Volume V, Cost Data," February 1973.

32-6

"Reusable Nuclear Stage Definition Study, Phase IV, Final Report," December 1972.

32-7

"Reusable Nuclear Stage Advance Structures Study, Final Report," March 1972.

32-8

"Final Briefing Nuclear Stage System Definition Study Phase IV," January 10, 1973.

Box 33  Nuclear Space Flight Systems

33- 1

"Parametric Study of Space Power Systems Final Report Volume I-Summary," November 1968.

33-2 

"Nuclear Flight Propulsion Module Definition Study Final Report, Part I, NFPM Design," May 1970.

33- 3

"Nuclear Flight Propulsion Module Definition Study, Final Report Part 2-System Analysis," May 1970.

33-4

"Nuclear Flight Propulsion Module Definition Study Final Report, Part 3-System Development," May 1970.

33- 5

"Nuclear Flight Propulsion Module Definition Study, Final Report Part 4-Reliability Analysis," May 1970.

33-6   

"Nuclear Flight System Definition Study, Final Report, Volume I-Summary," May 1970.

33- 7 

"Nuclear Flight System Definition Study," Final Report, Volume II, RNS System Definition Part I, System Analysis, May 1970.

33- 8 

"Nuclear Flight System Definition Study," Final Report, Volume II, RNS System Definition Part II-Single Module Concept Definition, May 1970.

33- 9 

"Nuclear Flight System Definition Study," Final Report, Volume II, RNS System Definition Part III-Multiple Module Concept Definition, May 1970.

33-10 

"Nuclear Flight System Definition Study," Final Report, Volume III Supporting Research and Technology Report, May 1970.

33-11 

"Nuclear Flight System Definition Study," Phase II Final Briefing, Reusable Nuclear Shuttle Concepts, May1970.

33-12

"Report on the Design Requirements for Reactor Power Systems for Manned Earth Orbital Applications," Task Area III Design and Integration Analysis Book 1,September 1966.

 

Box 34   Nuclear Space Flight Systems

34-1

"Nuclear Shuttle System Definition Study," Phase III, Final Performance Review, April 14, 1971.

34-2

"Module Nuclear Vehicle Study, Phase II," Volume IX Nuclear Propulsion Module, Development Program Plan, March 31, 1967.

34-3

"Modular Nuclear Vehicle Study Phases IV and V, Summary and SRT Requirements and Engine Design Criteria," December 31, 1969.

34-4

"Nuclear Shuttle Systems Definition Study Phase III," Final Report Volume 1- Executive Summary, May 1, 1971.

34-5A

 "Nuclear Shuttle Systems Definition Study Phase III, Final Report Volume II Concept and Feasibility Analysis, Part A- System Evaluation and Capability," May 1, 1971.

34-5B

"Nuclear Shuttle Systems Definition Study Phase III, Final Report Volume II Concept and Feasibility Analysis, Part B- Baseline System Definition," May 1,1971.

34-5C

"Nuclear Shuttle Systems Definition Study Phase III Final Report Volume II Concept and Feasibility Analysis, Part C- Systems Engineering Documentation," May 1, 1971.

34-6

"Nuclear Shuttle Systems Definition Study Phase III, Final Report Volume III Program Support Requirements," May 1, 1971.

34-7

"Nuclear Shuttle Systems Definition Study Phase III, Final Report volume IV Cost Data," May 1, 1971.

34-8

"Nuclear Shuttle Systems Definition Study Phase III, Final Report Volume V, schedules Milestones, and Networks," May 1, 1971.

34-9

"Nuclear Shuttle Systems Definition Study Phase III, Final Report Volume VI Reliability and Safety Analysis," May 1, 1971.

34-10

"Nuclear Shuttle Systems Definition Study Phase III, Final Report Volume VII RNS Tank Pressurization Analysis," May 1, 1971.

34-11

"Nuclear Shuttle Systems Definition Study Phase III, Final Report Volume VIII RNS Test Program Requirements-NRDS," May 1, 1971.

34-12

"Modular Nuclear Vehicle Study Phase II, Volume X Research and Technology Implications," November 1,1967.

34-13

"Modular Nuclear Vehicle Study Phase KK, Volume XI Nuclear Radiation Environment," October 16, 1967.

34-14

"Modular Nuclear Vehicle Study Phase IV, Engine Clustering Study," April, 11, 1969.

34-15

"Modular Nuclear Vehicle Study Phase IV, Radiation Analysis of a Nuclear Lunar Logistics Vehicle," December 22, 1969.

34-16

"Nuclear Flight System Definition Study, Phase II Final Report," May 1, 1970.

34-17

"Nuclear Shuttle System Definition Study Phase KKK, Final Performance Review Executive Summary," April 14,1971.

34-18

"In-flight Nuclear Vehicle Radiation Environment Phase III, Volume I Revised Radiation Environment Calculations," September 30, 1971.

34-19

"In-flight Nuclear Radiation Environment Phase II, Volume II Comparisons of Nuclear Propulsion Module Radiation Environments," April 30, 1971.

34-20

"In-flight Nuclear Vehicle Radiation Environment Phase II, Volume I Reusable Nuclear Stage Dual Cell Configuration," February 5, 1971.

34-21

"In-flight Radiation Environment of Nuclear Propulsion Modules," July 16, 1970.

34-22

"Calculation of In-flight Modular Nuclear Vehicle Radiation Environment Phase 1, Nuclear Propulsion Module In-flight Radiation Environment," June 30, 1970.

34-23

"Nuclear Flight systems Definition Study, Final Briefing," May 19, 1970.

34-24

"Nuclear Flight System Definition Study Phase II, Final Report Volume III, Reusable Nuclear Stage Concept Design, and Volume IV Supporting Research and Technology," May 1, 1970.

34-25

"Nuclear Flight System Definition Study Phase II Final Report, Volume II Reusable Nuclear Stage Missions and Operations," May 1, 1970.

   

Box 35   Nuclear Space Shuttle Studies

35-1

"Final Briefing, Nuclear Shuttle Definition Study Phase III," April 14, 1971.

35-2

"Nuclear Shuttle System Definition Study Phase III, Final Report Volume II Concept and Feasibility Analysis Part A, Class 1 Hybrid RNS Book 1 System Analysis and Operations," May 1971.

35-3

"Nuclear Shuttle System Definition Study Phase III, Final Report Volume II Concept and Feasibility Analysis Part A Class 1, Hybrid RNS Book 2 System Definition," May 1971.

35-4

"Nuclear Shuttle System Definition Study Phase III, Final Report Volume II, Concept and Feasibility Analysis Part B Class 3 RNS Book 1 System Analysis and Operations," May 1971.

35-5

"Nuclear Shuttle System Definition Study Phase III, Final Report Volume II, Concept and Feasibility Analysis Part B Class 3 RNS Book 2 System Definition," May 1971.

35-6

"Nuclear Shuttle System Definition Study Phase III, Final Report Volume III, Program Support Requirements Part A Class 1 Hybrid RNS."

35-7

"Nuclear Shuttle System Definition Study Phase III, Final Report Volume III, Program Support Requirements Part B Class 3 RNS," May 1971.

35-8

"Nuclear Shuttle System Definition Study Phase III, Final Report Program Support Requirements; Volume III Part C Program Support Requirements Volume III, Part C Test Program Analysis and SRT Requirements," May 1971.

35-9

"Nuclear Shuttle System Definition Study Phase III, Final Report Volume IV, Cost Data Part A Class I Hybrid RNS," May 1971.

35-10

"Nuclear Shuttle System Definition Study Phase III, Final Report Volume IV, Cost Data Part B Class 3 RNS," May 1971.

35-11

"Nuclear Shuttle System Definition Study Phase III, Final Report Volume V, Schedules, Milestones, and Networks," May 1971.

35-12

"Nuclear Shuttle System Definition Study Phase III, Final Report Volume VI, Reliability and Safety Analysis," May 1971.

35-13

"Nuclear Shuttle System Definition Study Phase III, Final Report Volume VII RNS Project Requirements," May1971.

35-14

"Executive Summary Nuclear Shuttle Definition Study Phase III," April 15, 1971.

                    

   ŠTHE CUSHING MEMORIAL LIBRARY OF TEXAS A&M UNIVERSITY